Project owner:
Ministry of Environment, Water and Agriculture
Project summary:
Treating and reducing the volume of radioactive waste in the spent sands of the purification plant by 10% or less, where a treatment unit was built to purify the sand and extract radioactive waste from it. Supply of radiation protection equipment.
Geological and hydrogeological study Treating 2 wells and reducing the concentration of radioactive radium isotopes in the produced water to 50% of the original concentration.


