Project owner:
The Ministry of Industry and Mineral Resources
Project summary:
Geological study for 2 sites (sand and dolomite) Surveying of 2 sites
- Preparing a topographical map for 2 sites Preparing a geological map for 2 sites Collect surface samples
- Core drilling
- Analyze samples chemically and physically Estimation of mineral resources in quantity and quality.


